HVAC Air Duct Line Super 3
![HVAC Air Duct Super Line 3](https://static.wixstatic.com/media/dd9658_9b2722ff5144474090c5f9993b57aebc~mv2.jpg/v1/fill/w_570,h_570,al_c,q_80,enc_avif,quality_auto/dd9658_9b2722ff5144474090c5f9993b57aebc~mv2.jpg)
HVAC Air Duct Super Line 3 for square pipe
![HVAC Air Duct Super Line 3](https://static.wixstatic.com/media/dd9658_032e368de745464ab8fc0175bff8fba9~mv2.jpg/v1/fill/w_570,h_570,al_c,q_80,enc_avif,quality_auto/dd9658_032e368de745464ab8fc0175bff8fba9~mv2.jpg)
HVAC Air Duct Super Line 3 for square pipe.
![HVAC Air Duct Super Line 3](https://static.wixstatic.com/media/dd9658_5c89f3b19b134bbd96fc86227a4d1f50~mv2.jpg/v1/fill/w_570,h_570,al_c,q_80,enc_avif,quality_auto/dd9658_5c89f3b19b134bbd96fc86227a4d1f50~mv2.jpg)
HVAC Air Duct Super Line 3 for square pipe.
![HVAC Air Duct Super Line 3](https://static.wixstatic.com/media/dd9658_9b2722ff5144474090c5f9993b57aebc~mv2.jpg/v1/fill/w_570,h_570,al_c,q_80,enc_avif,quality_auto/dd9658_9b2722ff5144474090c5f9993b57aebc~mv2.jpg)
HVAC Air Duct Super Line 3 for square pipe
HVAC Auto Duct Production Line Super 3
1. The latest design can resolve the problems like getting stuck, too many repairs from roll-shearing displacement lock machine.
2. The three-line bending function can crimp narrow edges and stably process 0.5-1.2mm galvanized sheet to avoid wasting.
Function:
It's mainly for uncoiling, leveling, beading, punching, locking. Because of its small space requirement and easy to install and operate the machine can upgrade to " super line 4".
![HVAC Air Duct Line Super 3](https://static.wixstatic.com/media/dd9658_67d5710772c140aeae7fe06e3d0f5761~mv2.png/v1/fill/w_558,h_217,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/dd9658_67d5710772c140aeae7fe06e3d0f5761~mv2.png)
Performance features:
1) All the rolling reels are made of bearing steel so that the lifetime prolongs by more than 5 times.
2) Under the material-saving mode of CNC system, machine can withdraw material automatically after finishing tasks.
3) With production memory functions, the production orders can be tracked and checked.
Basic Configuration:
1) One electric coil cradles,2 material trays(5-7T each roll).
2) One rack.
3) One host(line 3 host).
4) One mechanical arm clutching, locating and transferring platform.
5) One displacement type locking machine.
6) One set of computer controlling system.
Main Import Configuration:
1) Cylinder imported from Germany Festo.
2) Beijing Huade or hydraulic system from Taiwan.
3) Japan Omron encoder.
4) Taiwan Hiwin linear guideways.
5) Taiwan Delta CNC system.
Main Technical Parameters:
![HVAC Air Duct Line Super 3](https://static.wixstatic.com/media/dd9658_1f9ff4a771334f6586976ab31477300c~mv2.jpg/v1/fill/w_599,h_191,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/dd9658_1f9ff4a771334f6586976ab31477300c~mv2.jpg)